Connect Learn Finance

Redirect notice

You are being redirected to the platform Enko where you can access 100% free resources to boost your business. This is a collaboration between Visa and Connectamericas for Women.
Purchasing announcements

Bolivia-Chile Electrical Interconnection Study, Second Phase

Start date

Friday, August 21, 2026

Closing date

Saturday, September 5, 2026

Country

Sector

Conventional energy exploration and production

Project

RG-T4900

Description

The Inter-American Development Bank (IDB), in coordination with the energy authorities of Bolivia and Chile, invites consulting firms to submit proposals for the second phase of the study of the electrical interconnection between the two countries.

The objective is to evaluate the technical, economic, regulatory and socio-environmental feasibility of energy interconnection in a 20-year analysis horizon, quantifying the joint and individual benefits for both electricity systems.

1. Technical scope and central objectives
Energy modeling (SDDP and PowerFactory): Simulate the multi-nodal and multi-reservoir operation of both countries under isolated and interconnected modalities. For Chile, the ≥200 kV" transmission network will be modeled and for Bolivia the ≥69" kV network.
Selection of alternatives: Evaluate at least six (6) route and infrastructure options – including Back-to-Back direct current technology – considering technical, economic, territorial and socio-environmental impact criteria.
Regulatory and legal framework: Analyze the legislation in force in Chile and Bolivia to propose the legal instruments and network code adjustments necessary to enable the commercial exchange of energy.

2. Key activities and evaluation of the project
Complementarity and supply/demand analysis: Evaluate the integration of renewable resources (solar, wind, hydro) and load profiles to select the three (3) best interconnection alternatives.
Conceptual design and grid stability: Define the transmission capacity, compensation requirements, CapEx/OpEx estimation, and evaluate the contribution of the interconnection to resilience, systemic inertia and voltage/frequency control in the face of major contingencies.
Multi-criteria evaluation and economic model: Quantify operational savings, GHG emission reductions, and congestion rents through cost-benefit, financial, and sensitivity analyses.
Roadmap and implementation: Formulate an action plan to guide the regulatory, environmental, social, and technical steps required for project execution.

3. Expected inputs and outputs
Unified databases: Simulation files validated in SDDP and PowerFactory, along with editable spreadsheets and methodological documentation.
Conceptual design and multi-criteria matrix: Technical specifications of the infrastructure, cost estimate by country and comparative feasibility report.
Regulatory Report and Roadmap: Diagnosis of the binational legal framework and strategic implementation plan phase by phase.

Note: Interested companies should review the requirements on the BEO Bidder Portal.

Eligible countries

Argentina
Bahamas
Barbados
Belize
Bolivia
Brazil
Chile
Colombia
Costa Rica
Dominican Republic
Ecuador
El Salvador
Guatemala
Guyana
Haiti
Honduras
Jamaica
Mexico
Nicaragua
Panama
Paraguay
Peru
Suriname
Trinidad and Tobago
Uruguay
USA
Venezuela
You must be signed in order to apply for this opportunity.

Share with a friend

Because you viewed this announcement


Loading...

Other recommended content


Loading...

Other users also viewed


Loading...
Enter the e-mail you used when you registered for ConnectAmericas to create a new password