Development of the project and detailed engineering for the renovation and modernization of the 500 kV stations (proy0026 rsg)
Start date
Closing date
Country
Argentina
Sector
Business and Professional Services
IDB Project
RG-L1124 : Modernization of the Salto Grande Binational Hydropower ComplexImportant Notice
This action will open an external link.
Description
The Salto Grande Mixed Technical Commission invites consulting companies and/or JVCA, with internationally recognized experience and prestige in the elaboration of integral projects for the renovation of 500 kV stations, to present expressions of interest in participating in this call, which has the following objective:
Prepare the Executive Project for the complete renovation of the four (4) 500 kV stations, covering the following systems and equipment: switching equipment; protection, control and command systems; measurement and communication; auxiliary systems and parameter monitoring, including the preparation of the Technical Specifications of the bidding documents for contracting the supply; assembly and commissioning of the mentioned interventions, to execute RSG PROY0117.
Interested parties must provide information, only in Spanish or through translation into that language, to support their qualification to provide the services required in this call (specific background, engineering skills, projects, description of similar services, experience in identical conditions, similar organizational capacities, renewal of AT and EAT stations in service).
The total number of pages provided by interested parties should not exceed 140 pages. Interested parties can join other companies in the form of Joint Venture or subcontractors to improve their qualifications. The nationality of the company will be that of the country in which it is legally incorporated and in the case of a joint venture, it will be the nationality of the company that is designated as representative. For more information, visit the supplier's section of the website https://www.saltogrande.org (https://www.saltogrande.org/).
The estimated budget for the consultancy service to be contracted will be US $ 725,000 (seven hundred and twenty-five thousand US dollars), excluding value-added tax. There are intervention restrictions in this consultancy and the hiring processes: PROY0117 RSG: Renewal of the control, protection and measurement system of the 4 SSEE of 500 kV quadrilateral and the power system of the medium voltage network of SSEE SGA and SGU. PROY0000 RSG (SG 655): Provision of technical assistance for supervision, inspection, technical studies and support to the management of the first stage of the Salto Grande Renovation Project.
For more information, contact the contracting entity.
Follow Us